--> Saudi Arabia High-strength SAC Clinker-Jiaozuo Huayan Industrial Co., Ltd. Calcium, aluminate, CSA

Saudi Arabia High-strength SAC Clinker

Product application: This product is a new product jointly developed by our company and China National Academy of Building Materials Science. It is mainly used to produce quick hardening, low alkalinity, self stressing sulphoaluminate cement, special mortar and other high-performance special building materials.

Product Description

Technical Requirement

Executive Standard: High Performance Sac Clinker Powder (gb20472 - 2006)

Grade: 38 And 32

Fineness: Specific Surface Area Greater Than 450m/kg

Setting Time: Initial Setting Not Earlier Than 25min, Final Setting Not Later Than 5h

Product Use

This Product Is A New Product Jointly Developed By Our Company And China National Academy Of Building Materials Science It Is Mainly Used To Produce Quick Hardening, Low Alkalinity, Self Stressing Sulphoaluminate Cement, Special Mortar And Other High-performance Special Building Materials.

Chemical Composition

Type AL2O3 SiO2
38 Grade ≥38 ≤7.0
32 Grade 32-38 ≤10.5

Strength

Type ​Compressive Strength Flexural Strength
1d 3d 1d 3d
38 Grade ≥60 ≥90 ≥7.5 ≥9.0
32 Grade ≥40 ≥70 ≥6.5 ≥7.0

Matters Needing Attention

During The Construction Process, It Is Not Allowed To Mix With Alkaline Cementitious Substances Such As Portland Cement And Lime, And The Mixing Equipment Must Be Washed Before Use;

Due To The Rapid Hydration Rate Of Sulphoaluminate Minerals, New Hydrated Minerals Will Be Generated Immediately After Adding Water. When Mixing Concrete And Mortar, Water Must Be Added At One Time, And It Is Prohibited To Add Water Twice In The Middle:

The Curing Of Concrete Products Shall Be Strengthened. After Pouring, The Surface Of Concrete Products Shall Be Immediately Covered With Water Absorbing Materials Such As Wet Straw Curtains To Keep The Surface Moist. The Concrete Products Shall Be Cured For 24 Hours. Even If The Concrete Products Have Been Put Into Use, The Concrete Products Shall Be Kept Moist For 1-3 Days To Prevent Exposure To The Sun.

Packaging And Storage

The Crystal Is Packed In 25kg Bags And Ton Bags (1000kg), And Other Packaging Forms Are Determined By Both Parties Through Negotiation. During Transportation And Storage, It Shall Not Be Affected With Damp Or Mixed With Sundries. The Storage Period Shall Be Three Months, And Strength Inspection Shall Be Conducted Again After Expiration.